Past Projects Experience
No | End Client | Project | Description / Scope |
---|---|---|---|
1 | Petronas | LNG Drain Line Modification of FSU 1 & 2 | Re-validate piping stress, load, and displacement results as per ASME B31.3 piping code for LNG lines using CAESAR II. |
2 | Exxon Mobil | Evaluating Steam Desuperheater Package MS-997 | Evaluating structural responses and stresses of piping system according ASME B31.3 piping code using CAESAR II. Generate & submit stress report. |
3. | Petronas | P-EDMS P&ID Drawing & Data Conversion | Converting PID drawings from AutoCAD (non-intelligent) into intelligent drawing using SmartPlant P&ID (SPPID) tool for platforms M3DR-A, B11DR-A, ANDR-A, ANDP-B where it is used to streamline OO's operation and maintenance process. |
4 | Brooke Dockyard & Engineering Works Corporation | Setup SPI at BDY premises | Configure & setup Oracle 10g R2, SPI 2009 SP2 as per project requirements at client's DB server, app server and client machines. Create and provide details installation manual. |
5. | Exxon Mobil | Pressure Reducing Desuperheater Station MS-190 | Evaluating structural responses and stresses of piping system according ASME B31.3 piping code using CAESAR II. Generate and submit stress report. |
6. | Tialoc Malaysia Sdn Bhd | Migrate Legacy Spec and CADWorx Drawing from CADWorx 2010 to CADWorx 2018 | Converting customer legacy specs & drawings from CADWorx 2010 to 2018. Perform quality assurance checks on specs and model after completion. |
7. | Petronas | P-EDMS Data Extraction, Validation and transformation to Petronas RAPID PMMS Templates | - Conduct detail OCR on Technical Documents (Datasheets, Index, Register, Lists) - Conduct QA/QC on OCR documents in preparation for Data Extraction - Make engineering judgments during properties mapping activities to specific SAP Equipment Characteristic Template - Conduct QA/QC on extracted data |
8. | Sapura Fabrication Sdn Bhd | Smart Material (SMAT) & SAP Integration | Develop interfaces to bridge the gap between Smart Material & SAP for creation code, PR, PO, and material issuance |
9. | Petronas | RAPID Project - P16B Raw Water Treatment Plant | - Provide user training. - Implement which includes setup of Smart Enterprise tools such as SPPID, SPI, SPEL, S3D, SSK, SPR, and SPF at the client's premises according to the project requirements. Configure as per the client's business processes. - Provide consulting services which include identifying gaps and communicating with the project lead/system owner to avoid any project delay - Provide administrator support to configure specs, symbols, drawings, reports, patch updates etc for all disciplines - Perform quality assurance check on each tool to meet owners' expectation - Assist in generating tools' backup as final deliverables to hand over to the end client |
10 | UniKL MICET | Train the Trainers project (SPPID, SPI & S3D) | - UniKL MICET's vision is to train undergraduate engineers to be equipped with skills and knowledge in SPPID, SPI & S3D tools - Configure & Setup SPPID, SPI & S3D in UniKL MICET computer lab. Create and provide a details installation manual. - Using a sample project and executing the ' Train the Trainer' program for approximately 30 lecturers. - Assist in creating course outlines for students |
11. | MIE Industrial Sdn Bhd | RAPID Project – P32 | Configure & setup SPPID 2014, SPI 2013, SPEL 2009 SP5, and S3D 2014 R1 as per project requirements at the client's DB server, app server, and client machines. Create and provide a details installation manual |
12. | Petronas | RAPID Project – Data Compliance Check | Perform 90% milestone data check for RAPID packages (such as P1, P3, P6A, P7, P11, P12A, P12B, P16A, P29, P30) and submit Gap Analysis Reports for each SmartPlant tools (SPPID, SPI, SPEL & S3D) |
13. | BASF | PDS to S3D Data & Model Translation for BPC Plant | - Translation of Piping & Electrical Reference Data from PDS v12 to S3D v2016 - Translation of as-built PDS v12 DB to S3D v 2016 - Extraction of Iso & GA drawings from S3D |
14. | Petronas Shell Terminal | Engineering: Update AsBuilt 3D Model in S3D tool | - Configure and create piping specs according to PTS specs and bulkload into S3D catalog DB - Create custom piping custom specialty and map new symbol in S3D environment - Re-model as-built plant for PST & bunkering areas in S3D based on reference 3D model (after scanned) - Update all tags as per existing PID & GA Drawings - Generate deliverables such as ISOs and GAs for submission |
15. | Sapura Energy Berhad & Sapura Fabrication Sdn Bhd | Smart Yard Deployment Project | Provide consultation, implementation, and technical support which include system upgrades, configuring interfaces, training, and handholding services to SEB to prepare and execute GOREK & Pegaga projects using the latest version of Intergraph Smart Yard solutions (Smart Materials, SPIOP, Smart Construction, SmartPlant Spoolgen, Smart Production, Smart WQMS) based on Advanced Work Packaging (AWP concept) |